BRIDGES

Scioto County Bridge – Full Depth

PLACED: November 8, 2024
TYPE: Full Depth
CUBIC YARDS: 40
PRODUCER: Tow Path Ready Mix
CONTRACTOR: DGM Inc.
PRODUCTS USED: UltraFinish 1L

Crider Road Bridge
Mansfield, OH

PLACED: June, 2024
TYPE: Full Depth
CUBIC YARDS: 250
PRODUCER:  Moritz Ready Mix
CONTRACTOR: Mosser Construction
PRODUCTS USED: UltraFinish 1L

The Crider Road bridge was placed using ODOT specs. Moritz Materials used their state approved JMF mix design. UltraFinish 1L Nano Silica Admixture was used in lieu of the 7-day continuous wet cure process.

DOWNLOAD PROJECT SPOTLIGHT PDF

We had absolutely no trouble with UltraFinish 1L. More people should be using it.

Working with Mosser Construction, we conducted a test pour before the Crider Road bridge project. We had no issues with the product and experienced favorable results with both the test pour and the bridge deck.


Tony Restelli – Moritz Materials

Robinson Road Bridge
Fort Jennings, OH

PLACED: May 24, 2024
TYPE: Full Depth
CUBIC YARDS: 45
PRODUCER:  Ernst Concrete
CONTRACTOR: R.G. Zachrich
PRODUCTS USED: UltraFinish 1L

SR-189 Bridge SCD Overlay
Fort Jennings, OH

PLACED: May 10, 2024
TYPE: SDC Overlay
CUBIC YARDS: 48
PRODUCER:  K&L Ready Mix
CONTRACTOR: BCC Construction
PRODUCTS USED: UltraFinish 1L

Olt Road Bridge
Lima, OH

PLACED: April 26, 2024
TYPE: Full Depth
CUBIC YARDS: 47
PRODUCER:  Ernst Concrete
CONTRACTOR: R.G. Zachrich
PRODUCTS USED: UltraFinish 1L, Impede® IntraSeal

The Olt Road bridge is the first bridge deck in Allen County, Ohio to use both UltraFinish 1L and Impede® IntraSeal together. This combination improves impermeability results over standard concrete, and research has shown that this combination performs equally, or better than, a topically applied curing compound. In addition, the RILEM absorption test confirms this deck shows zero water penetration at 28 days.

 

DOWNLOAD OLT ROAD PROJECT SPOTLIGHT PDF

RILEM testing was performed on the Olt Rd. bridge deck. After one hour, the test showed 0% water absorption on the Impede® IntraSeal and UltraFinish 1L deck.

Williams County, OH

PLACED: November 2, 2023
TYPE: Full Depth
CUBIC YARDS: 50
PRODUCER:  Pahls Ready Mix
CONTRACTOR: R.G. Zachrich
PRODUCTS USED: UltraFinish 1L

First bridge deck in Ohio approved for use of UltraFinish 1L in lieu of a 7-day wet cure.

PAVING

Heritage Hills & Wedgewood Commons Subdivision Reconstruction, Phase IV
Farmington Hills, MI

PLACED: July, 2024
TYPE: 7-inch pavement with integral curb
CUBIC YARDS: 3700 and 900
PRODUCER: Florence Cement Co.
CONTRACTOR: Florence Cement Co.
PRODUCTS USED: UltraFinish 1L and UltraFinish 1L/Impede IntraSeal Combination

Incorporating UltraFinish 1L in the mix extended the finishing window. Less effort was required to finish the concrete, and no honeycombing was observed on the backside of the curb.

Burns Street Reconstruction
Southgate, MI

PLACED: April, 2024
TYPE: 8-inch pavement with integral curb
CUBIC YARDS: 900
PRODUCER: Hercules Concrete LLC
CONTRACTOR: GV Cement
PRODUCTS USED: UltraFinish 1L/Impede IntraSeal Combination